Project Description

Designing for Women and Child Hospital with G+4 floors, 7100m2 area. Site condition for the hospital at Ponnani was challenging due to its proximity to the sea and high water table. Piling was not an option on account of possible caving. Strip raft opted and excavation was done in the compartment to manage subsoil seepage.